Grapevine May 7

Spoke at mkt close;  is in  Sacramento in  daily  contact  with Reno ironing  out  agreement which may be  far enough along  to be  agreed  to both  sides  early  next  week. Tuesday meet is on  schedule.  Is  doing medical work  up finish to renew  pilot’s lisc and  sees no problem if  comfort  dog can land  a  piston  twin with  supervision.  Told him  could  apply  for  age  exemption  to be  1st  officer on a  Germanwings  737. No landing  qualification  needed.

 

In  reality is   very confident and  we  feel we can joke  around long last.  Look ahead to summer and a distinct possibility the  same investors  may be  around  for more. That means  the  same  cash behind  JV may be had  to be  behind  Mexus  itself.  That’s probably  more  than can be  said  but  seemed  clear to me.    In no rush with prospect  of  several decades in  venture  and it’s  the  details  that  count.  Many can recall Rob’s need to rescue  Minera Andes  who never  bothered  to read   own contract  with Hochschild  San Jose  mine JV required  them to pay demand for start up  expenses BEFORE first  profit  realized .  Get it  right prior to signing anything  away.  Should be  enough for  both to profit  richly simply  much more important to Mexus   health ongoing. 8

Was pretty much my take with a lengthy conversation I had with Paul yesterday. He came off as very positive with the “Likelihood” that both sides are in agreement. He was jovial and seemed upbeat, even mentioned he’s been sleeping pretty good as of late. So hope it’s Argonaut! Would be sweet. He also mentioned there is yet another suitor that is biting at the bit to sign on if for some reason current deal falls through. Bunch of other good stuff in the works once we get through JV hurdle. I’m getting a warm fuzzy I may be cracking a couple bottles good Zins here shortly. Not putting cart before horse, but hot damn…fingers, toes, and maybe even eyes crossed through the next week or so. Cheers,”  Zins

Actually I was  quoting  you until he  called,  Zins.  He’s had a non- stop year with so many  obstacles  personal and  corporate is good to feel him easing  up and  let  the tea leaves  settle in the  cup.   Get back to  early ’12  when all looked  rosey  to simply  pump out  $1900 gold.  8

Blast at  Sonora  mine  Argonaut  is  by  licensed  contractor. Sound familiar? 8

 

“Mining Method

The mining method employed at the La Colorada Mine consists of traditional open pit drill and blast operations followed by

excavator loading of rigid body haul trucks for ore transport to a crusher and waste transport to designated dump locations.

The mine contractor Sinergia, S.A. de C.V. (“Sinergia”) drills 5.5-inch holes which are loaded with sacked ANFO. The

amount of ANFO loaded is approximately 52 kg per drill hole. Argonaut pays for explosives as is common in Mexico, but

the contractor is responsible for loading, priming and blasting of rock. Drill chips are sampled and sent to the local assay lab

for grade control map creation by the mine engineering staff.”

 

http://www.sedar.com/GetFile.do?lang=EN&docClass=1&issuerNo=00025546&fileName=/csfsprod/data151/filings/02319850/00000001/C%3A%5CSEDAR%5CFILINGS%5CAR_AIF_Mar2015.pdf

 

 

 

Leave a Reply