Hi 8,
Do you know if they plan on doing it as an underground operation still or would like to open up the pit? I recall 20 tons a day was what the skip could handle and somewhere from 0.5 opt to 6opt.
Thanks.”
Announced drill program will define any future open pit and pad placement. Pit where there is and pads where there aint. Plan all along was ASAP operate shaft as known highest grades. It’s cleaned out and says needs just explosive permit and crew cleared for safety underground. Any decent sized local miner can do on contract. Preference is integrate in larger plan but without partner to start with least shows determined ability to do things alone.
He’s not been down in awhile as little to do not well handled by Julio and Caborca staff. We heard of a visit led by Julio, graduate geologist and better informed on family ranch than even Paul. They’ve met as needed now, despite venom spewed , 1st time in CA. He will NOT say when he’s traveling often alone from Ajo Muni. AP cross border. You can easily see supposed friendly shareholders raging nonsense transposed to a serious minded enemy. Will say when he’s back not going. Figure some small valuable stuff may be carried flying back perhaps. Only an Obama tells enemy what will or not do before hand. I’m as anxious and more than any I know to succeed but it’s ON MUTUAL acceptable terms he approves. NOT GOING to go through this sinking millions and getting bullshit heaped again. Let him work it out and my feeling’s benefits are assured in acceptable time frame for near any miner I know. 3 1/2 years since family signed on is nothing in a mine’s start up life. Getting it all right is the important thing and lots of water flowed under the Mexus bridge since Jan 2011. We’ll see that all that happed Sonora way will have assisted any profitable outcome. Any needing a genuine loss free to go ahead and take it now. A give away of asset assures Mexus under a dime and ANOTHER share in great profit. 8
“On January 5, 2011, Mexus Gold Mining S.A. de C.V. entered into a Purchase Agreement to purchase the Caborca Project”