Were NO NAMES not available any asked. Matt, driller’s had a picture once. Hanka’s ones who never could ship on holidays to Trinidad JV. Many too occupied negative posting to possibly keep up.
PR on KItco at 1:40. Earlier better but stuff gets there when it gets there. For them’s can’t read? Timing to mine is #1 move very large but portable placer shaker screen table, underway with decision to go alone and load intake chute with water running. #2, 20 ton Julio 2 hoist running daily least one shift with blast permit applied for next week to start drifting and defining safety shaft in highest grades on the 26 sq K’s. Mill just sits there waiting fine crush bin to conveyor.
Hanka Explosives were San Felix contractors. Along with Sonoran Gov’s security team protection there ( we STILL Own 50%until paid ) are trustworthy both ways.
Hanka Ehttp://www.cosmos.com.mx/empresa/4jrx/compania-industrial-hankaxplosis
Track mounted RC drill used at San Felix.
Drilling Shear zone Julio I think for core awhile ago
For exploring has drill mounted on a Cat as well. Can operate with no pad set up and go anyplace quick and dirty. Power take off has limited Horse power for depth. Rods stuck often so changed to smaller diameter core. 8
All sounds good. Hope to add some more shares in the meantime. Not familiar how long a blasting permit usually takes to get approved. Any idea 8?
With assist? Fellows at Aztek/Silver pursuit jailed an at large criminal and I was a Federales plant. Apply and that’s about it +/- a few months.
Eight,
Glad Paul is going ahead with this even while still in negotiations with potential partners. Be curious to hear what replies you get from McEwen, Doody and the Reid’s. Any idea how long it may take to get the blast permit? I’m assuming that the blast permit shouldn’t be an issue or take very long based on his mining timeline. Very happy with this news!