Click on Cesar Lemas “see  report”. Pretty  strong  stuff  there!!!

“Mexus’ diamond drilling project, which was scheduled to start on September 15, 2014 is now scheduled to start October 20, 2014. The contracted driller, Matt Westervelt, had medical issues which caused this delay. Mexus has already drilled four diamond NH drill holes to 200 feet. On September 25th, the first 108 feet were delivered to a Reno, NV assay company. The results of this assay will be released when received. These first four holes were drilled in a shear zone identified by our geologist, Cesar Lemas. (see report)”-

Cesar lays  it all out advising  need  for deep drills. Depth to work seems  about  1000 meters  to veins narrows. That’s a kilometer deep! Look at  highest  PPM Au  of  1.36. To get oz/ton  divide by  2200, multiply  by  2000  and again divide   by 31.1   grams  per  troy  oz. Comes  to  .04 oz/ton. POG $1200  earns  $48  ton of  ore. That’s  leach value  plus  silver to add  in. Those  areas working  at  1000 ton daily   make  $48K! Toss in really hi grade  shaft stuff at least .5 oz? Each 20 ton hoist  brings  $12K milled  out. Ball mill  doing  60 tons  is $36K.  $48K plus $36K  is  $84,000. $84K here, $84K there  starts to be  real money! Crush up to 5K daily  makes  $240K leach and  mill can do 80 tons  easy AND  enlarge  with another  mill as planned  all along. Getting  along  toward  $100,000,000 yearly.  $100 million  here , $100 million there ……..8

http://gpex.ca/smf/index.php?topic=3037.0;wap2

easiest is PPM  is  grams per  ton so divide by  31.1.  1.36 PPM is  .0437 oz/ton. POG $1200 =$52.44

 

 

Leave a Reply