When the dealings done

Timmins would have been wise  to have  taken  Mexus  property.  Greatly larger  area with high sulfides problems  and much weaker mineralization  a LONG ways  away far S Mexico and  certainly  no more  developed since  2012.    Very  similar production goals but MUCH harder  to produce with need  to oxidise  for  heap leach and  apparent SOME oxidized pockets for milling extraction.  Rough half  gram /ton over  all.  Near  $800/oz  to produce.  100% for  $10 mil and  16 mil TGD  @ .90. TGD is   near  $25 mil.

 

http://www.goldgroupmining.com/s/caballoblanco.asp

Leave a Reply