Re: None | 0 | |
Post # of 32842 |
CABORCA, Mexico, September 23nd, 2019 (GLOBE NEWSWIRE) — Mexus Gold US (OTCQB: MXSG) ..the company has reached capacity with the Merrill Crowe gold recovery plant currently in use. The plant is running at 30gpm and producing 3oz of gold per day.
Function of a MC is RECOVERY to the preg pond of dissolved metal when zinc attracted gold and silver ions filtered for clean and flux to product when optimized by enough available for efficient of cost labor and material. Seldom then will be smelted and poured daily for that reason. Once recovery began continuous the 30 GPM MC has been running 24/7 since with announced ability to recover not smelt least 3 oz a day. It will be switched off when the larger continuous 500GPM has been tested alongside with the Garcia designed MC system same as he used for the portable running half speed… WHY? to allow maxed assay build in preg to support 17 times flow.
WHAT THE CEO DID announce at my birthday party instead of all faked nonsense by non attendance from months on invited used here as we know as some great long standing joke. I even held to last minute a VIP room reserved never used. Check P’mill VIP and security alerted for look out assistance on 23rd Sept. Nevada casino resort professional folk are known deathly serious not some to play around. No jokes allowed
Need better answer to … How to tell a HOBBY POSTER from a SEC required full informed pro mine interested developer?