Big item is fuel then labor which is a front loader driver , a truck driver another front loader to screen hopper and 2 guys max watching wash process. Same drivers can haul away the waste in same truck after pile is built to sustain production. When shift week’s up Momo and another worker unload the black sand drawers to recover across riffles. BIg stuff is picked out and black sand is spun for fine gold and into the sack. Goes to buyer for often same day cash then settled up by refinery value. Has always said 1 oz pays for as much placer as they can run AND the daily expenses of present low ops status. Under $300 oz cost if 4 oz output. Do more? costs less. 8